The cassettes that leaked every quarter — fixed by moving the coil out of the room
F&B Manufacturing · Simpang Ampat, Penang

The cassettes that leaked every quarter — fixed by moving the coil out of the room

Both rooms at 24–27°C · the quarterly leaks gone

Project summary
IndustryF&B snack production
Area~1,800 sq ft, 2 rooms
Solution1 × 2-in-1 integrated
Distribution12 vents (6 / room)
Holds24–27°C

The snack production area was cooled by ceiling cassette units — the standard choice, and the wrong one for this room. Snack production throws fine powder into the air, and that powder did what powder always does to a coil sitting in it: it clogged the cassettes and filters until the indoor units backed up and leaked water onto the production floor. In a food-production area.

The only fix was a clean-and-repair cycle every three months, every unit, forever — ongoing cost, recurring downtime, water over a food line.

The real problem was never cooling capacity — it was putting a coil inside a powder-filled room. So we took the indoor units out of the rooms entirely: a single 2-in-1 integrated unit sited away from the powder, ducting cold air into both rooms through 12 outlets. Both rooms now hold 24–27°C, and with no coil breathing powder, the quarterly clog-and-leak cycle is gone.

On site

Have a floor like this?

Tell us your space, temperature and the problem you're fighting. We'll assess it on site — no obligation.

Got a cooling problem no one has solved? Tell us — the rest is our problem.