CNC Precision · Bukit Mertajam, Penang

Bigger floor, less horsepower — two old splits out, one SystemAir in

A bigger floor, cooled on one 7 HP unit

Project summary
IndustryCNC production
Floor1,830 sq ft
Ceiling12 ft
Operation24 / 7
Was2 × 5 HP conventional
Now1 × 7 HP SystemAir

The floor was running two 5 HP conventional splits, 24 hours a day, over about 1,000 sq ft — for a measured RM3,000 a month in electricity. Then they extended it to 1,830 sq ft under a 12 ft ceiling.

The conventional path was to bolt on a third 5 HP unit — 15 HP total — and watch the bill climb with the square footage. Instead they pulled out both old units and put in a single 7 HP SystemAir to cover the whole enlarged floor.

Installed June 2026. A bigger floor, now cooled on one 7 HP unit — less installed horsepower than simply 'adding a third unit' would have carried.

On site

Have a floor like this?

Tell us your space, temperature and the problem you're fighting. We'll assess it on site — no obligation.

Got a cooling problem no one has solved? Tell us — the rest is our problem.
WhatsApp Us